2025 ANNUAL REPORT

Maintenance Teams


Leadership training: (5 courses, 22 hours total)

Bill Gentry and Barbara Stephens-Macri led a training session for the Lockshop and Maintenance Teams 1, 2, and 3. The session focused on equipping managers with tools and guidance to support success in their leadership roles.

World of Work

Hunter Koontz

The World of Work event offered students a behind-the-scenes look at the work performed by the Maintenance and Utilities team. Staff demonstrated basic plumbing principles and provided a sound demonstration to show how noise can be reduced within building systems. The team also explained how thermostats automatically control heating systems and fan blowers to regulate indoor environments. These demonstrations gave students insight into the systems and technical skills required to support safe and comfortable campus facilities.

Maintenance and Utilities Teams Projects

Team 1 – 

1) Pit supply fan replacement. 

2) UCC air stations replacements  

3) Reynolda loading dock baler installation

4) ZSR Library and Wait Chapel – Installed new redi heat

5) Tribble Hall – Steam coil replacement – AHU 1-3

Team 2 – 

1) Installed hydraulic cement and waterproofing in the Babcock elevator B pit to eliminate leakage and odors

2) Assisted with Collins renovation (Valves, fan coils, ceiling tiles)

3) Installed 4 new butterfly valves at Polo Hall

4) Student apartment project complete-pumps sleds, valves, drives

5) Complete summer residence hall inspections

Team 3 – 

1) LJVM, chiller, boiler and generator projects  

2) Bridger field house emergency repair to railing

3) McCreary Tower- Window cleaning (drone)

4) Indoor tennis court- Installed new LED lights on one court

5) Miller Center sports medicine hydrotherapy – Pool Pak replacement

Lockshop – 

1) Rekeyed 3 residence halls & updated key software (Luter, Magnolia, Polo) total number of re-keys 530

2) Removed 143 Locks & Cores from Alumni Hall for remodel

3) Restored 5 sets of interior doors @ Wait Chapel

4) Replaced Reynolda Hall loading dock doors & hardware, Generator & High voltage doors

5) Implemented key delivery and integrated key software to capture key holder signatures

By the Numbers